Certing srl Services
Product Certification and Conformity Assessment
DIRECTIVE 2006/42/EC -
CERTIFICATION OF MACHINES PLACED ON THE MARKET IN ACCORDANCE WITH DIRECTIVE 2006/42/EC
CERTING guarantees the machine conformity assessment service so that compliance with the Essential Safety Requirements is verified and the CE marking is authorized and therefore the placing on the Community market.
Annex IX
EC Type Examination
17. Appliances for lifting persons or persons and goods, with a risk of vertical falls greater than 3 metres.
22. Roll-Over Protective Structures (ROPS)
23. Falling Objects Protective Structures (FOPS)
DIRECTIVE 2014/33/EU -
CERTIFICATION AND ASSESSMENT OF CONFORMITY OF LIFTS IN ACCORDANCE WITH DIRECTIVE 2014/33/EU
CERTING guarantees elevator manufacturers the conformity assessment service to the requirements of the Directive.
Product: Elevators Modules / Conformity Assessment Procedures:
PRD scheme according to the UNI CEI EN ISO/IEC 17065:2012 standard
- Annex IV – Part B – Module B (EU type examination of elevators)
- Annex VIII – Module G (Conformity based on unit verification for elevators)
- Certifications issued pursuant to paragraph 1, letter a), of Presidential Decree 8/2015 (ref. “Derogation Systems”).
Deroga”).
ISP scheme according to the UNI CEI EN ISO/IEC 17020:2012 standard
- Annex V – (Final examination of elevators))
DIRECTIVE 2014/68/EU -
CERTIFICATION OF PRESSURE EQUIPMENT AND ASSEMBLIES PLACED ON THE MARKET IN ACCORDANCE WITH DIRECTIVE 2014/68/EU
CERTING interviene in qualità di Organismo Notificato nella valutazione delle conformità, secondo quanto previsto nei A2, C2, F, G, e nell'emissione di certificati.
Products: Pressure equipment and assemblies referred to in art. 1
Conformity assessment modules/ procedures:
PRD scheme according to the UNI CEI EN ISO/IEC 17065:2012 standard
-Annex III – Module C2 (Conformity to type based on internal production control plus supervised pressure equipment checks at random intervals)
- Annex III – Module F (Conformity to type based on verification of pressure equipment)
- Annex III – Module G (Conformity based on unit verification)
ISP scheme against UNI CEI EN ISO/IEC 17020:2012
- Annex III – Module A2 (Internal production control plus official checks of pressure equipment at random intervals);
CERTING supports manufacturers of pressure equipment and assemblies in identifying the most suitable conformity assessment procedure for their activity, following all the control phases described in the Directive.